General requirements, direction, and methods for qualifying Class 1E connection assemblies for service in nuclear power generating stations are provided. Connectors, terminations, and environmental seals in combination with related cables…
Withdrawn Standard. Withdrawn Date: Oct 25, 1996. The most common sheath-bonding systems now in use, and the methods of calculating sheath voltages and currents, are described. The concern is particularly…
Superseded by 576-2000. A guide to installation, splicing, termination, and field-proof testing of cable systems is provided. The aim is to avoid premature cable failure due to improper installation and…
A guide for installing, splicing, terminating, and field proof testing of cable systems in industrial and commercial applications is provided. It is not intended to be a design document, although…
Uniform minimum acceptable requirements for the performance of reliability analyses for safety-related systems found in nuclear power generating stations are provided. The requirements can be applied during design, fabrication, testing,…
This standard is intended to serve as a basis for a range of modular instrumentation capable of interfacing transducers and other devices to digital controllers for data and control. It…
Methods used to place cable underground vary widely. The choice of method depends on such factors as soil conditions, surface and subsurface obstructions, total footage to be installed, spacing between…
IEEE Standard for Exposed Semiconducting Shields on High-Voltage Cable Joints and Separable Insulated Connectors, provides design tests for shield resistance and a simulated fault-current initiation for exposed semiconducting shields used…