Superseded Standard

IEEE 576-1989

IEEE Recommended Practice Installation, Termination, and Testing of Insulated Power Cable as Used in the Petroleum and Chemical Industry

Superseded by 576-2000. A guide to installation, splicing, termination, and field-proof testing of cable systems is provided. The aim is to avoid premature cable failure due to improper installation and mechanical damage during installation, and to provide a reference that can be specified for cable installations. This standard is not intended to be a design document; many of the problems of installation can be avoided by designing cable layouts with the installation limits of this recommended practice.

Standard Committee
IAS/PCI - Petroleum and Chemical Industry
Status
Superseded Standard
Superseded by
576-2000
Board Approval
1989-01-24
History
ANSI Approved:
1989-06-12
Published:
1989-08-07

Working Group Details

Society
IEEE Industry Applications Society
Standard Committee
IAS/PCI - Petroleum and Chemical Industry

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


576-2000
IEEE Recommended Practice for Installation, Termination, and Testing of Insulated Power Cable as Used in Industrial and Commercial Applications

A guide for installing, splicing, terminating, and field proof testing of cable systems in industrial and commercial applications is provided. It is not intended to be a design document, although many of the problems of installation can be avoided by designing cable layouts within the installation limits of this recommended practice.

Learn More About 576-2000

Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.