Superseded by 576-2000. A guide to installation, splicing, termination, and field-proof testing of cable systems is provided. The aim is to avoid premature cable failure due to improper installation and mechanical damage during installation, and to provide a reference that can be specified for cable installations. This standard is not intended to be a design document; many of the problems of installation can be avoided by designing cable layouts with the installation limits of this recommended practice.
- Standard Committee
- IAS/PCI - Petroleum and Chemical Industry
- Status
- Superseded Standard
- Superseded by
- 576-2000
- Board Approval
- 1989-01-24
- History
-
- ANSI Approved:
- 1989-06-12
- Published:
- 1989-08-07
Working Group Details
- Society
- IEEE Industry Applications Society
- Standard Committee
- IAS/PCI - Petroleum and Chemical Industry
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards