Inactive-Reserved Standard

IEEE 576-2000

IEEE Recommended Practice for Installation, Termination, and Testing of Insulated Power Cable as Used in Industrial and Commercial Applications

A guide for installing, splicing, terminating, and field proof testing of cable systems in industrial and commercial applications is provided. It is not intended to be a design document,although many of the problems of installation can be avoided by designing cable layouts within the installation limits of this recommended practice.

Standard Committee
IAS/PCI - Petroleum and Chemical Industry
Status
Inactive-Reserved Standard
PAR Approval
1995-09-21
Superseding
576-1989
Board Approval
2000-09-21
History
ANSI Approved:
2001-01-08
ANSI Withdrawn Date:
2011-09-09
Published:
2001-04-30
Inactivated Date:
2019-11-07

Working Group Details

Society
IEEE Industry Applications Society
Standard Committee
IAS/PCI - Petroleum and Chemical Industry
Working Group
ADMIN_8217 - Project Administration_8217
IEEE Program Manager
Michael Kipness
Contact Michael Kipness

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards