A guide for installing, splicing, terminating, and field proof testing of cable systems in industrial and commercial applications is provided. It is not intended to be a design document,although many of the problems of installation can be avoided by designing cable layouts within the installation limits of this recommended practice.
- Standard Committee
- IAS/PCI - Petroleum and Chemical Industry
- Status
- Inactive-Reserved Standard
- PAR Approval
- 1995-09-21
- Superseding
- 576-1989
- Board Approval
- 2000-09-21
- History
-
- ANSI Approved:
- 2001-01-08
- ANSI Withdrawn Date:
- 2011-09-09
- Published:
- 2001-04-30
- Inactivated Date:
- 2019-11-07
Working Group Details
- Society
- IEEE Industry Applications Society
- Standard Committee
- IAS/PCI - Petroleum and Chemical Industry
- Working Group
-
ADMIN_8217 - Project Administration_8217
- IEEE Program Manager
- Michael Kipness
Contact Michael Kipness
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards