PC62.92.5 - IEEE Draft Guide for the Application of Neutral Grounding in Electrical Utility Systems, Part V-Transmission Systems and Subtransmission Systems
Project Details
Basic factors and general considerations in selecting the class and 38 means of neutral grounding for a particular ac transmission or subtransmission system are covered. An apparatus to be used to achieve the desired grounding is suggested, and methods for specifying the grounding devices are given. Transformer tertiary systems, equipment-neutral grounding, and the effects of series compensation on grounding are discussed.
Sponsor Committee
PAR Approval
PARs
Additional Resources Details
Historical Base Standard
Working Group Details
Working Group
Sponsor Committee
Society
IEEE Program Manager
Existing Standards