Replaced by 1120-2004. IEEE Std 1120-1990, IEEE Guide to the Factors to Be Considered in the Planning, Design, and Installation of Submarine Power and Communications Cables, provides a checklist of factors to be considered in the planning, design, and installation of power and communications cables in a submarine environment. It does not attempt to provide complete cable design criteria.
- Standard Committee
- PE/IC - Insulated Conductors
- Status
- Superseded Standard
- Superseded by
- 1120-2004
- Board Approval
- 1990-09-28
- History
-
- ANSI Approved:
- 1996-07-16
- Published:
- 1990-11-15
- Reaffirmed:
- 1995-12-12
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/IC - Insulated Conductors
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards