This guide presents a list of factors to consider when planning, designing, installing, and repairing a submarine power cable.
- Standard Committee
- PE/IC - Insulated Conductors
- Status
- Inactive-Reserved Standard
- PAR Approval
- 2000-12-07
- Superseding
- 1120-1990
- Board Approval
- 2004-09-23
- History
-
- ANSI Approved:
- 2005-02-02
- Published:
- 2005-03-31
- Reaffirmed:
- 2010-06-17
- Inactivated Date:
- 2021-03-25
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/IC - Insulated Conductors
- Working Group
-
C11W/1120_WG - Submarine Cables Working Group
- IEEE Program Manager
- Dalisa Gonzalez
Contact Dalisa Gonzalez - Working Group Chair
- Harry Orton
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
P1120
IEEE Draft Guide for Planning, Design, Installation, and Repair of Submarine Power Cable Systems
This guide presents a list of factors to consider when planning, designing, installing, and repairing a submarine power cable.
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards
