This guide provides a list of factors to consider when planning, designing, permitting, installing, commissioning and repairing submarine power cable systems. While many factors are common to both power and communication cable, this guide focuses on power cables.
- Standard Committee
- PE/IC - Insulated Conductors
- Status
- Active PAR
- PAR Approval
- 2016-12-07
- Superseding
- 1120-2004
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/IC - Insulated Conductors
- Working Group
-
C11W/1120_WG - Submarine Cables Working Group
- IEEE Program Manager
- Dalisa Gonzalez
Contact Dalisa Gonzalez - Working Group Chair
- Harry Orton
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
1120-2004
IEEE Guide for the Planning, Design, Installation, and Repair of Submarine Power Cable Systems
This guide presents a list of factors to consider when planning, designing, installing, and repairing a submarine power cable.