This guide describes selection and application considerations for the unit power transformer and unit auxiliaries power transformer. Consideration is given to connections that include direct connection and connections through generator circuit breakers and load-break switches. The considerations referred to in this guide apply to hydroelectric and thermal electric generating stations. Various power transformer connections and possible operating problems under normal and abnormal conditions are treated. Phasing procedures, basic impulse insulation level selection, and loading practices are not covered.
- Status:
Get Involved In The Development Of This Standard
Contact the IEEE-SA Liaison Simply click here to voice your interest. Erin Spiewak Learn More About Standards ParticipationAnyone can participate, there are a variety of programs and services to
facilitate the involvement of industry and the public. More Become a Member and Ballot on this StandardMembership empowers you to participate & lead in the development of
standards. Tell Me More