The development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS) are covered in this guide.
- Sponsor Committee
- PE/SUB - Substations Committee
- Status
- Superseded Standard
- PAR Approval
- 2012-11-02
- Superseded by
- C37.123-2023
- Superseding
- C37.123-1996
- Board Approval
- 2016-03-03
- History
-
- ANSI Approved:
- 2017-09-05
- Published:
- 2016-05-25
Working Group Details
- Society
- IEEE Power and Energy Society
- Sponsor Committee
- PE/SUB - Substations Committee
- Working Group
-
WGK12 - WGK12 - Specifications for High Voltage Gas-Insulated Substations Rated 52kV and Above
- IEEE Program Manager
- Patricia Roder
Contact Patricia Roder - Working Group Chair
- George Becker
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
C37.123-2023
IEEE Guide for Specifications for High-Voltage Gas-Insulated Substations Rated 52 kV and Above
The development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS) are covered in this guide.
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards