Superseded Standard

IEEE C37.123-1996

IEEE Guide to Specifications for Gas-Insulated, Electric Power Substation Equipment

Technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS) are provided. Parameters to be supplied by the purchaser and the technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer are discussed. Environmental conditions, general and specific equipment requirements, and a proposal data sheet form are provided to aid the user.

Standard Committee
PE/SUB - Substations Committee
Status
Superseded Standard
Superseded by
C37.123-2016
Superseding
C37.123-1991
Board Approval
1996-09-19
History
ANSI Approved:
1997-02-27
Published:
1996-11-30
Reaffirmed:
2008-06-12

Working Group Details

Society
IEEE Power and Energy Society
Standard Committee
PE/SUB - Substations Committee
Working Group
WGK0 - Inactive - High Voltage Gas-Insulated Substations Working Group
IEEE Program Manager
Sandra Maru
Contact Sandra Maru

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


C37.123-2023
IEEE Guide for Specifications for High-Voltage Gas-Insulated Substations Rated 52 kV and Above

The development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS) are covered in this guide.

Learn More About C37.123-2023

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


C37.123-2016
IEEE Guide for Specifications for High-Voltage Gas-Insulated Substations Rated 52 kV and Above

The development of specifications for the technical requirements for the design, fabrication, testing, installation, and in-service performance of a high-voltage gas-insulated substation (GIS) are covered in this guide.

Learn More About C37.123-2016

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.