This guide provides general recommendations for the selection of methods, equipment, and tools that have been found to be practical for the stringing of overhead transmission line conductors and overhead groundwires. The guide also includes a comprehensive list of definitions for equipment and tools used in stringing and for stringing terms commonly employed. This guide does not address special conductors such as those used for river and canyon crossing because they may be custom designed and often may require special considerations.

Standard Committee
PE/T&D - Transmission and Distribution
Status
Active PAR
PAR Approval
2022-05-13
Superseding
524-2016

Working Group Details

Society
IEEE Power and Energy Society
Standard Committee
PE/T&D - Transmission and Distribution
Working Group
TPC-15.11.03 - Construction of Overhead Lines Working Group
Learn More About TPC-15.11.03 - Construction of Overhead Lines Working Group
IEEE Program Manager
Michael Kipness
Contact Michael Kipness
Working Group Chair
Robert Millies

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


P691
Guide for Transmission Structure Foundation Design and Testing

The material presented in this design guide pertains to the design of foundations for conventional transmission line structures, which include lattice towers, single or multiple shaft poles, H-frame structures, and anchors for guyed structures. It discusses the mode of loads that those structures impose on their foundations and applicable foundation performance criteria. The design guide addresses subsurface investigations and the design of foundations, such as spread foundations (footings), drilled shafts, direct embedded poles, driven piles, and anchors. The full-scale load testing of the above-listed foundation types is also presented. This design guide does not include the structural design of the foundations nor the design of the structure. The foundation engineer should have an understanding of the magnitudes and time-history of various loading conditions imposed on the foundations in order to provide a suitable foundation to support the transmission line structures under the actual loading conditions that may be reasonably expected in actual service.

Learn More About P691

P977
Guide to Installation of Foundations for Transmission Line Structures

This guide presents various approaches to good practice that improve the installation of transmission line structure foundations. This guide covers only the construction aspects of the installation of the foundations.

Learn More About P977

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


524-2016
IEEE Guide for the Installation of Overhead Transmission Line Conductors

General recommendations for the selection of methods, equipment, and tools that have been found to be practical for the stringing of overhead transmission line conductors and overhead groundwires are provided.

Learn More About 524-2016

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


524-2003
IEEE Guide to the Installation of Overhead Transmission Line Conductors

Revision of IEEE Std 524-1992. SUMMARY: This guide provides general recommendations for the selection of methods, equipment, and tools that have been found to be practical for the stringing of overhead transmission line conductors and overhead groundwires. The guide also includes a comprehensive list of definitions for equipment and tools used in stringing and for stringing terms commonly employed. This guide does not address special conductors such as those used for river and canyon crossing. These conductors may be custom designed and often may require special considerations.

Learn More About 524-2003

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


977-2010
IEEE Guide to Installation of Foundations for Transmission Line Structures

Various approaches to good construction practices that could improve the installation of transmission line structure foundations are presented. Spread foundations, drilled shaft foundations, pile foundations, and anchors are treated. This guide is intended to be used as a reference source for those involved in the ownership, design, and construction of transmission structures.

Learn More About 977-2010

Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.