Uniform technical minimum requirements for the interconnection, capability, and lifetime performance of inverter-based resources interconnecting with transmission and sub-transmission systems are established in this standard. Included in this standard are performance requirements for reliable integration of inverter-based resources into the bulk power system, including, but not limited to, voltage and frequency ride-through, active power control, reactive power control, dynamic active power support under abnormal frequency conditions, dynamic voltage support under abnormal voltage conditions, power quality, negative sequence current injection, and system protection. This standard also applies to isolated inverter-based resources that are interconnected to an ac transmission system via dedicated voltage source converter high-voltage direct current (VSC-HVDC) transmission facilities; in these cases, the standard applies to the combination of the isolated IBRs and the VSC-HVDC facility, and not to an isolated inverter-based resource (IBR) on its own.
- Standard Committee
- PE/EDPG - Energy Development & Power Generation
- Joint Sponsors
-
PE/PSRCC
PE/EM
- Status
- Active Standard
- PAR Approval
- 2020-12-03
- Board Approval
- 2022-02-09
- History
-
- Published:
- 2022-04-22
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/EDPG - Energy Development & Power Generation
- Working Group
-
WSPPID/WSPI/WSPI-P - P2800 - Wind and Solar Plant Interconnection Performance (WSPI-P)
- IEEE Program Manager
- Vanessa Lalitte
Contact Vanessa Lalitte - Working Group Chair
- Jens Boemer
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards