The coordination of design, material supply, installation, and test procedures required for the connection of a gas-insulated substation (GIS) is described. Preferred dimensions for mechanical and electrical interchangeability for voltage classes of 69kV and above are established.
- Standard Committee
- PE/IC - Insulated Conductors
- Status
- Superseded Standard
- Superseded by
- 1300-2011
- Board Approval
- 1996-08-01
- History
-
- ANSI Approved:
- 1997-02-06
- Published:
- 1995-11-30
- Reaffirmed:
- 2002-06-13
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/IC - Insulated Conductors
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards