Active Standard

IEEE C57.13.1-2017

IEEE Guide for Field Testing of Relaying Current Transformers

This guide describes field test methods that assure that current transformers are connected properly, are of marked ratio and polarity, and are in a condition to perform as designed both initially and after having been in service for a period of time.

Sponsor Committee
PE/PSRCC - Power System Relaying and Control
Learn More About PE/PSRCC - Power System Relaying and Control
Status
Active Standard
PAR Approval
2013-12-11
Superseding
C57.13.1-2006
Board Approval
2017-12-06
History
Published:
2018-10-31

Working Group Details

Society
IEEE Power and Energy Society
Learn More About IEEE Power and Energy Society
Sponsor Committee
PE/PSRCC - Power System Relaying and Control
Learn More About PE/PSRCC - Power System Relaying and Control
Working Group
C57.13.1_WG - Field Testing of Relaying Current Transformers
IEEE Program Manager
Malia Zaman
Contact Malia Zaman
Working Group Chair
Bruce Magruder

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


C57.13.1-1981

IEEE Guide for Field Testing of Relaying Current Transformers

A description is given of field-test methods that will ensure that the current transformers used as a source of relay input current are connected properly, are of marked ratio and polarity, and are in condition to perform as designed both initially and after a period of service. The standard covers safety considerations; current transformer types and construction and the effect of these on test methods; insulation resistance tests; ratio tests; polarity check; winding and lead resistance (internal resistance); excitation tests; burden measurements; and specialized situations.

Learn More About C57.13.1-1981

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.