Conformance test requirements are provided for current and inductively-coupled voltage transformers used for measurement and control functions in unit substations at primary system voltages above 600 V, but not exceeding 38 kV, except for those in certain installations as set forth in the standard. The selection of transformers for conformance testing, the basis for conformance, and the treatment of failures within a test sequence are covered. Impulse, voltage-withstand, accuracy, and temperature rise are specified. Insulation systems acceptance and production monitoring are considered
- Standard Committee
- PE/TR - Transformers
- Status
- Inactive-Withdrawn Standard
- Superseded by
- C57.13.2-2005
- Superseding
- C57.13.2-1986
- Board Approval
- 1991-12-05
- History
-
- Withdrawn:
- 1997-12-09
- ANSI Approved:
- 1992-12-23
- Published:
- 1992-07-10
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/TR - Transformers
- Working Group
-
WGC57.13 - Instrument Transformers - Req for Inst. Xfrmrs
- IEEE Program Manager
- Patrycja Jarosz
Contact Patrycja Jarosz - Working Group Chair
- David Wallace
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
C57.13.2-2005
IEEE Standard for Conformance Test Procedure for Instrument Transformers
Test requirements for conducting conformance tests on instrument transformers used on 60 Hz primary systems with voltages from 600 V through 38 kV. This standard covers selection of transformers for conformance testing, basis for conformance, treatment of failures, tests required, (e.g., impulse, voltage withstand, accuracy, temperature rise, mechanical rating), insulation system acceptance, and production monitoring.
