Active Standard

IEEE C57.12.58-2017

IEEE Guide for Conducting a Transient Voltage Analysis of a Dry-Type Transformer Coil

General recommendations for measuring voltage transients in dry-type distribution and power transformers are provided. Recurrent surge voltage generator circuitry, instrumentation, test sample, test point location, mounting the test coil, conducting the test, and reporting results are covered.

Sponsor Committee
PE/TR - Transformers
Learn More About PE/TR - Transformers
Status
Active Standard
PAR Approval
2015-09-03
Superseding
C57.12.58-1991
Board Approval
2017-06-15
History
Published:
2017-11-13

Working Group Details

Society
IEEE Power and Energy Society
Learn More About IEEE Power and Energy Society
Sponsor Committee
PE/TR - Transformers
Learn More About PE/TR - Transformers
Working Group
WGC57.12.58 - Dry Type Transformers - Transient Analysis Working Group
IEEE Program Manager
Patrycja Jarosz
Contact Patrycja Jarosz
Working Group Chair
Kenneth Klein

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


PC57.12.58
Guide for Conducting a Transient Voltage Analysis of a Dry-Type Winding

This guide applies to the equipment setup, measurement, simulation, and analysis of the transient voltage response of a dry-type winding to a simulated impulse voltage waveform.

Learn More About PC57.12.58

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


C57.12.58-1991
IEEE Guide for Conducting a Transient Voltage Analysis of a Dry-Type Transformer Coil

General recommendations for measuring voltage transients in dry-type distribution and power transformer are provided. Recurrent surge voltage generator circuitry, instrumentation, test sample, test point location, mounting the test coil, conducting the test, and reporting results are covered.

Learn More About C57.12.58-1991

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.