Wideband measurement of the apparent charge of partial discharges (PDs) that may occur in liquid-filled power transformers and shunt reactors excited by ac test voltages between 40 Hz and 400 Hz are discussed. The major components of the PD measuring circuit including the calibrator are specified in compliance with IEC 60270. The PD test procedure is described and recommendations for the evaluation of PD test results are presented.
- Standard Committee
- PE/TR - Transformers
- Status
- Inactive-Reserved Standard
- PAR Approval
- 2009-05-11
- Superseded by
- C57.113-2023
- Superseding
- C57.113-1991
- Board Approval
- 2010-06-17
- History
-
- ANSI Approved:
- 2011-01-14
- Published:
- 2010-08-20
- Inactivated Date:
- 2021-03-25
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/TR - Transformers
- Working Group
-
WGC57.113 - Dielectric Tests - WG on PD Measurement Working Group
- IEEE Program Manager
- Patrycja Jarosz
Contact Patrycja Jarosz - Working Group Chair
- Ali Naderian Jahromi
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
C57.113-2023
IEEE Recommended Practice for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors
Wideband measurement of the apparent charge of partial discharges (PDs) that may occur in liquid-filled power transformers and shunt reactors excited by ac test voltages between 40 Hz and 400 Hz are discussed. The major components of the PD measuring circuit including the calibrator are specified in compliance with IEC 60270. The PD test procedure is described and recommendations for the evaluation of PD test results are presented.
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
C57.113-1991
IEEE Guide for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors
The detection and measurement by the wide-band apparent charge method of partial discharges occurring in liquid-filled power transformers and shunt reactors during dielectric tests are covered. This standard covers the measuring instrument, calibrator characteristics, test circuits, calibration procedure, and partial discharge measurement during induced-voltage tests.
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards