Inactive-Reserved Standard

IEEE C57.113-2010

IEEE Recommended Practice for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors

Wideband measurement of the apparent charge of partial discharges (PDs) that may occur in liquid-filled power transformers and shunt reactors excited by ac test voltages between 40 Hz and 400 Hz are discussed. The major components of the PD measuring circuit including the calibrator are specified in compliance with IEC 60270. The PD test procedure is described and recommendations for the evaluation of PD test results are presented.

Standard Committee
PE/TR - Transformers
Status
Inactive-Reserved Standard
PAR Approval
2009-05-11
Superseded by
C57.113-2023
Superseding
C57.113-1991
Board Approval
2010-06-17
History
ANSI Approved:
2011-01-14
Published:
2010-08-20
Inactivated Date:
2021-03-25

Working Group Details

Society
IEEE Power and Energy Society
Standard Committee
PE/TR - Transformers
Working Group
WGC57.113 - Dielectric Tests - WG on PD Measurement Working Group
IEEE Program Manager
Patrycja Jarosz
Contact Patrycja Jarosz
Working Group Chair
Ali Naderian Jahromi

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


C57.113-2023
IEEE Recommended Practice for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors

Wideband measurement of the apparent charge of partial discharges (PDs) that may occur in liquid-filled power transformers and shunt reactors excited by ac test voltages between 40 Hz and 400 Hz are discussed. The major components of the PD measuring circuit including the calibrator are specified in compliance with IEC 60270. The PD test procedure is described and recommendations for the evaluation of PD test results are presented.

Learn More About C57.113-2023

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


C57.113-1991
IEEE Guide for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors

The detection and measurement by the wide-band apparent charge method of partial discharges occurring in liquid-filled power transformers and shunt reactors during dielectric tests are covered. This standard covers the measuring instrument, calibrator characteristics, test circuits, calibration procedure, and partial discharge measurement during induced-voltage tests.

Learn More About C57.113-1991

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.