The technical requirements for the design, fabrication, testing, and installation of a gas insulated substations are covered. The parameters to be supplied by the purchaser are set, and the technical requirements for the design, fabrication, testing, and installation details to be furnished by the manufacturer are established.
- Sponsor Committee
- PE/SUB - Substations Committee
Learn More About PE/SUB - Substations Committee - Joint Sponsors
-
PE/SWG
- Status
- Active Standard
- PAR Approval
- 2018-03-08
- Superseding
- C37.122-2010
- Board Approval
- 2021-06-16
- History
-
- Published:
- 2021-08-25
Working Group Details
- Society
- IEEE Power and Energy Society
Learn More About IEEE Power and Energy Society - Sponsor Committee
- PE/SUB - Substations Committee
Learn More About PE/SUB - Substations Committee - Working Group
-
WGK1 - WGK1 - High Voltage Gas-Insulated Substations
- IEEE Program Manager
- Patricia Roder
Contact Patricia Roder - Working Group Chair
- Ryan Stone
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
C37.122-2010
IEEE Standard for High Voltage Gas-Insulated Substations Rated Above 52 kV
The technical requirements for the design, fabrication, testing, and installation of a gasinsulated substations are covered. The parameters to be supplied by the purchaser are set, and the technical requirements for the design, fabrication, testing, and installation details to be furnished by the manufacturer are established.