Active Standard

IEEE

IEEE Power Switchgear, Substations & Relays Standards Collection: VuSpec

Over a dozen templates based on official IEEE Standards available in Microsoft Word .doc format and also in OpenOffice.org .odt open document format for your convenience. Easy VuSpec Flash interface with navigator and search tool guides you through the templates and examples. Requirements Templates: 1) CONOPS: Software System Definition; Concept of Operations (based on IEEE Std 1362-1998) 2) SRS: Software Requirements Specification (based on IEEE Std 830-1998) Design Template: 3) SDD: Software Design Description (based on IEEE Std 1016-1998) Construction and End User Support Templates: 4) USER: Software User Documentation (based on IEEE Std 1063-2001) Includes bonus example templates with style sheets for technical writers: HTML Help (.chm) format; Oracle Help for Java format; JavaHelp format. Maintenance Template: 5) SMP: Software Maintenance Plan (based on IEEE Std 1219-1998) Configuration Management Template: 6) SCMP: Software Configuration Management Plan (based on IEEE Std 828-2005) Engineering Management Templates: 7) SAP: Software Acquisition Plan (based IEEE Std 1062-1998 R2002) 8) SPMP: Software Project Management Plan (based on IEEE Std 1058-1998) Process Template: 9) SEMP: Systems Engineering Management Plan (based on IEEE Std 1220-2005) Quality Templates: 10) SQAP: Software Quality Assurance Plan (based on IEEE Std 730-2002) 11) SSP: Software Safety Plan (based on IEEE Std 1228-1994 R2002) 12) SVVP: Software Verification and Validation Plan (based on IEEE Std 1012-2004) Plus, over 1,400 standards terms with definitions directly from the official IEEE/ISO/IEC Standards!

Status
Active Standard
History
Published:
2008-07-29

Working Group Details

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.