Outdoor AC substations, either conventional or gas-insulated, are covered in this guide. Distribution, transmission, and generating plant substations are also included. With proper caution, the methods described herein are also applicable to indoor portions of such substations, or to substations that are wholly indoors. No attempt is made to cover the grounding problems peculiar to dc substations. A quantitative analysis of the effects of lightning surges is also beyond the scope of this guide.
- Standard Committee
- PE/SUB - Substations Committee
- Status
- Superseded Standard
- Superseded by
- 80-2000
- Superseding
- 80-1976
- Board Approval
- 1985-03-21
- History
-
- ANSI Approved:
- 1991-12-18
- Published:
- 1986-08-08
- Reaffirmed:
- 1991-06-27
Additional Resources
- Interpretation
- 80-1986_interp.pdf
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/SUB - Substations Committee
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards