This standard provides a methodology for the interpretation of electric generating unit performance data from various systems and to facilitate comparisons among different systems. It also standardizes terminology and indexes for reporting electric generating unit reliability, availability, and productivity performance measures. This standard is intended to aid the electric power industry in reporting and evaluating electric generating unit reliability, availability, and productivity while recognizing the power industry's needs, including marketplace competition. Included are equations for equivalent demand forced outage rate (EFORd), newly identified outage states, discussion of commercial availability, energy weighted equations for group performance indexes, definitions of outside management control (OMC), pooling methodologies, and time-based calculations for group performance indexes.

Standard Committee
PE/AMPS - Analytic Methods for Power Systems
Status
Superseded Standard
PAR Approval
2004-08-12
Superseded by
762-2023
Superseding
762-1987
Board Approval
2006-09-15
History
ANSI Approved:
2006-12-29
Published:
2007-03-15
Reaffirmed:
2012-03-29

Additional Resources

Interpretation
762-2006_interp.pdf

Working Group Details

Society
IEEE Power and Energy Society
Standard Committee
PE/AMPS - Analytic Methods for Power Systems
Working Group
762_WG - Working Group for Electric Generating Unit
IEEE Program Manager
Vanessa Lalitte
Contact Vanessa Lalitte
Working Group Chair
Douglas Logan

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


P762
Standard Definitions for Use in Reporting Electric Generating and Storage Unit Reliability, Availability, and Productivity

This document standardizes terminology and indexes for reporting electric generating unit reliability, availability, and productivity performance measures that recognize the power industry's needs, including system reliability assessment, plant performance benchmarking, and marketplace competition. The standard currently covers conventional generators and variable energy resource (VER) generators. This revision extends the standard to include energy storage, both on a stand-alone basis and in a hybrid configuration with generation.

Learn More About P762

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


762-2023
IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity

Outlined in this document are standardized terminology and indexes for reporting electric generating unit reliability, availability, and productivity performance measures that recognize the power industry's needs, including marketplace competition. This standard also includes equations for equivalent demand forced outage rate (EFORd), newly identified outage states, energy weighted equations for group performance indexes, definitions of outside management control (OMC), pooling methodologies, and time-based calculations for group performance indexes. It includes consideration of variable energy resource units and resource unavailability and new indexes appropriate for that purpose.

Learn More About 762-2023

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


762-1987
IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity

This standard is intended to aid the electric power industry in reporting and evaluating electric generating unit reliability, availability, and productivity. It was developed to overcome present difficulties in the interpretation of electric generating unit performance data from various systems and to facilitate comparisons among different systems. The standard should also make possible the future exchange o meaningful data among systems in North America and throughout the world. Scope: This document standardizes terminology and indexes for reporting electric generating unit reliability, availability, and productivity performance measures. A generating unit includes all equipment up to the high-voltage terminal of the generator step-up transformer. Reliability in this standard encompasses measures of the ability of generating units to perform their intended function. Availability measures are concerned with the fraction of time a unit is capable of providing service, and account for outage frequency and duration. Productivity measures are concerned with the total power produced by a plant with respect to its potential power production. Therefore, productivity measures consider magnitude of outage as well as frequency and duration of outage. NOTE --This standard was developed for application at the unit level; the definitions are applicable below the unit level in most cases. There are some exceptions, however, such as the definition of in service, which applies only at the unit level. Because of these exceptions, care should be taken when using this standard below the unit level.

Learn More About 762-1987

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.