Recommended practices for designing and installing electric pipe heating control and alarm systems, as applied to mechanical piping systems that require heat, are provided. The recommendations include selection of control and alarm systems, accuracy considerations, local control usage, centralized control usage, qualification criteria of controls and alarms, and calibration and testing of controls and alarms. The intent is to ensure design consistency and reliable operation of electric pipe heating control and alarm systems, which in turn will ensure that piping system fluids will be available for use not only during station operation but also during normal shutdown.
- Standard Committee
- PE/EDPG - Energy Development & Power Generation
- Status
- Inactive-Withdrawn Standard
- Board Approval
- 1982-12-09
- History
-
- Withdrawn:
- 2006-02-06
- ANSI Approved:
- 1984-12-01
- Published:
- 1984-06-12
- Reaffirmed:
- 1999-09-16
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/EDPG - Energy Development & Power Generation
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards