Properties of commonly used jackets, as well as selection and testing of jackets, are covered in this guide. It is written for those responsible for optimizing cable designs. The purpose is to present a reasonably complete picture of the role of jackets so that the subject can be approached in an orderly and organized manner. An effort has been made to avoid the highly technical language and theory commonly used by electrical engineers and chemists to discuss the more detailed application of jackets.
- Standard Committee
- PE/IC - Insulated Conductors
- Status
- Active Standard
- PAR Approval
- 2014-03-27
- Superseding
- 532-2007
- Board Approval
- 2021-02-09
- History
-
- Published:
- 2021-04-27
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/IC - Insulated Conductors
- Working Group
-
A07W/P532 - Guide for Selecting & Testing Jackets for Power, Instrumentation, and Control Cables- P532
- IEEE Program Manager
- Dalisa Gonzalez
Contact Dalisa Gonzalez - Working Group Chair
- Paul Caronia
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards