IEEE Recommended Practice for Installation Design and Installation of Large Lead Storage Batteries for Generating Stations and Substations

Large stationary lead storage batteries play an ever-increasing role in substation and generating station control and power systems and in providing the back-up energy for emergencies. This recommended practice fulfills the need within the industry to provide common or standard practices for the design of battery installations and the battery installation procedures. The methods described are applicable to all installations and battery sizes.

Sponsor Committee
PE/EDPG - Energy Development & Power Generation
Status
Superseded Standard
Superseded by
484-1996
Superseding
484-1981
Board Approval
1986-12-11
History
ANSI Approved:
1987-05-18
Published:
1987-04-13

Working Group Details

Society
IEEE Power and Energy Society
Sponsor Committee
PE/EDPG - Energy Development & Power Generation

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.