Inactive-Withdrawn Standard

IEEE 415-1986

IEEE Guide for Planning of Preoperational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations

Directions for establishing an acceptable pre-operational testing program for Class 1E power systems in nuclear power generating stations are provided. The pre-operational tests are performed after the appropriate construction tests have been completed. Their purpose is to verify that the Class 1E power systems perform their required function as designed. The power systems are considered to include the ac and dc power supplies, but do not include the equipment that utilizes the power.

Sponsor Committee
PE/NPE - Nuclear Power Engineering
Learn More
Status
Inactive-Withdrawn Standard
Superseding
415-1976
Board Approval
1985-05-02
History
Withdrawn:
1998-03-19
ANSI Approved:
1985-07-26
Published:
1985-12-09
Reaffirmed:
1992-06-18

Working Group Details

Society
IEEE Power and Energy Society
Learn More
Sponsor Committee
PE/NPE - Nuclear Power Engineering
Learn More
No Active Projects
No Active Standards
No Superseded Standards
No Inactive-Withdrawn Standards
No Inactive-Reserved Standards
Subscribe

Stay up to date about new developments, including resources, insights and more.