Inactive-Withdrawn Standard

IEEE 415-1986

IEEE Guide for Planning of Preoperational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations

Directions for establishing an acceptable pre-operational testing program for Class 1E power systems in nuclear power generating stations are provided. The pre-operational tests are performed after the appropriate construction tests have been completed. Their purpose is to verify that the Class 1E power systems perform their required function as designed. The power systems are considered to include the ac and dc power supplies, but do not include the equipment that utilizes the power.

Standard Committee
PE/NPEC - Nuclear Power Engineering Committee
Status
Inactive-Withdrawn Standard
Superseding
415-1976
Board Approval
1985-05-02
History
Withdrawn:
1998-03-19
ANSI Approved:
1985-07-26
Published:
1985-12-09
Reaffirmed:
1992-06-18

Working Group Details

Society
IEEE Power and Energy Society
Standard Committee
PE/NPEC - Nuclear Power Engineering Committee

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.