Various field test methods that are currently available or under development are listed in this guide. The guide covers shielded, insulated power cable systems rated 5 kV and above. The guide describes the tests and gives advantages and disadvantages, suggested applications, and typical results. Complete guides covering some of the test methods listed are available in the form of IEEE 400 "point" documents.
- Standard Committee
- PE/IC - Insulated Conductors
- Status
- Inactive-Reserved Standard
- PAR Approval
- 2007-12-05
- Superseded by
- 400-2023
- Superseding
- 400-2001
- Board Approval
- 2012-03-29
- History
-
- Published:
- 2012-06-05
- Inactivated Date:
- 2023-03-30
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/IC - Insulated Conductors
- Working Group
-
F01W/P400_WG - Working Group on Field Testing and Evaluation of Shielded Power Cable Systems
- IEEE Program Manager
- Dalisa Gonzalez
Contact Dalisa Gonzalez - Working Group Chair
- Robert Hampton
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards