This guide applies to the cooperative planning and operation of Electric Vehicle (EV) aggregation systems and Renewable Energy (Wind Power, Photovoltaic) aggregation systems. The focus is on the Distribution System Operator (DSO) level and the aggregation of distributed energy, including rooftop photovoltaics, small-scale wind power, and EV charging/discharging (V2G/G2V) within local distribution grids. It encompasses technical areas including resource aggregation monitoring, joint power forecasting, cooperative planning methodologies, coordinated control strategies, and security and stability safeguards. It clarifies the functional boundaries and interaction logic among EV Aggregators, Renewable Energy Aggregation Units, and the Coordinated Operation Control Center. Core requirements include: grid interconnection compatibility (voltage/frequency response), V2G/G2V bidirectional power regulation parameters, standardized data interfaces (operational status, dispatchable capacity, forecast error), as well as provisions for information security and fault ride-through capability. This standard does not address specific equipment manufacturing requirements or transmission grid planning.
- Standard Committee
- SMC/SC - Standards Committee
- Status
- Active PAR
- PAR Approval
- 2026-06-04
Working Group Details
- Society
- IEEE Systems, Man, and Cybernetics Society
- Standard Committee
- SMC/SC - Standards Committee
- Working Group
-
3926-WG - Cooperative Planning and Operation of Electric Vehicle and Renewable Energy Aggregation Systems in Distribution Grids
- IEEE Program Manager
- Christy Bahn
Contact Christy Bahn - Working Group Chair
- Jizhong Zhu
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards
