Guide for Drawing Regional Icing Maps for Overhead Transmission Lines

This guide provides basic principles and recommended methods for drawing icing maps for overhead lines (OHLs) using unified and efficient procedures. Specifically, methods to calculate the ice thickness are recommended to deal with various geographic areas with different terrain and/or weather.

Standard Committee
PE/T&D - Transmission and Distribution
Status
Active PAR
PAR Approval
2021-11-09

Working Group Details

Society
IEEE Power and Energy Society
Standard Committee
PE/T&D - Transmission and Distribution
Working Group
P3134_WG - P3134 Working Group for Regional Icing Maps for Overhead Transmission Lines
Learn More About P3134_WG - P3134 Working Group for Regional Icing Maps for Overhead Transmission Lines
IEEE Program Manager
Meng Zhao
Contact Meng Zhao
Working Group Chair
Yongfeng CHENG

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.