
This document provides general guidance on the control and protection (C&P) tests of Hybrid Multi-terminal High Voltage Direct Current (HVDC) systems which consists of line commutated converter based sending terminals and voltage source converter based receiving terminals. It concerns preconditions, composition of the test system, test contents and boundaries, test items and design principles, organization and quality control requirements. Tests include the stages of factory test, acceptance test, site commissioning test and trial operation.
- Sponsor Committee
- PE/T&D - Transmission and Distribution
Learn More - Status
- Active PAR
- PAR Approval
- 2019-09-05
Working Group Details
- Society
- IEEE Power and Energy Society
Learn More - Sponsor Committee
- PE/T&D - Transmission and Distribution
Learn More - Working Group
-
HVDC/Multi-Terminal - Guide for Control and Protection System test of Hybrid Multi-terminal HVDC
Learn More - IEEE Program Manager
- Jiajia Liu
Contact - Working Group Chair
- Qi Guo
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards