Active Standard

IEEE 2778-2020

IEEE Guide for Solar Power Plant Grounding for Personnel Protection

This guide is primarily concerned with the grounding system design for photovoltaic solar power plants that are utility owned and/or utility scale (5 MW or greater). The focus of the guide is on differences in practices from substation grounding as provided in IEEE Std 80. This guide is not intended for the substations to interconnect the plant; however, if the substation is included within the plant, portions of this guide may be applicable. Similarly, this guide does not directly cover small scale solar power plants (such as rooftop type systems), substation grounding, or lightning protection.

Sponsor Committee
PE/EDPG - Energy Development & Power Generation
Learn More About PE/EDPG - Energy Development & Power Generation
Status
Active Standard
PAR Approval
2017-09-28
Board Approval
2020-01-30
History
Published:
2020-04-17

Working Group Details

Society
IEEE Power and Energy Society
Learn More About IEEE Power and Energy Society
Sponsor Committee
PE/EDPG - Energy Development & Power Generation
Learn More About PE/EDPG - Energy Development & Power Generation
Working Group
WSPPCD - Wind and Solar Plant Collector Design Working Group
IEEE Program Manager
Vanessa Lalitte
Contact Vanessa Lalitte
Working Group Chair
Loren Powers

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


P2778

Guide for Solar Power Plant Grounding for Personnel Protection

This guide addresses the grounding system design and analysis for personnel protection in ground-mount photovoltaic (PV) solar power plants (SPPs) that are utility owned and/or utility scale (generation capacity of 5 MW or greater). The guide is primarily concerned with personnel protection within the SPPs for power frequencies in the range of 50 Hz to 60 Hz.n n The guide expands upon methodologies, concepts, and practices provided for substation grounding in IEEE Std 80 to apply to a larger SPP facility.n n This guide does not apply to substations used to interconnect the solar plant. However, if the substation is included within the plant, portions of this guide may be applicable. Similarly, this guide does not directly cover small-scale SPPs (such as rooftop type systems), substation grounding, or lightning protection.

Learn More About P2778

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


2760-2020

IEEE Guide for Wind Power Plant Grounding System Design for Personnel Safety

The collector system grounding for wind power plants (WPPs) is the primary concern of this guide. This guide is not intended for the WPP substation; however, since the substation is typically interconnected with the collector system, its design might affect or be affected by the collector system. With proper consideration, the methods described herein could be used in determining the impact of the collector system on substation safety and vice versa. Quantitative analysis of the effects of lightning surges is beyond the scope of this document. Similarly, this guide does not cover offshore wind power plants, battery energy storage facilities, solar power plants, or substation grounding

Learn More About 2760-2020

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.