Active PAR

P1765

Recommended Practice for Estimating the Uncertainty in Error Vector Magnitude of Measured Digitally Modulated Signals for Wireless Communications: Conducted and Over-the-Air Hardware Verification

This document provides recommended practices for the determination of uncertainty in the estimation of error vector magnitude (EVM) of a measured digitally modulated wireless communication signal using both conducted and over-the-air (OTA) methods for receiver hardware verification.

Sponsor Committee
MTT/SC - Standards Committee
Joint Sponsors
IM/HFM
Status
Active PAR
PAR Approval
2023-02-15
Superseding
1765-2022

Working Group Details

Society
IEEE Microwave Theory and Techniques Society
Learn More About IEEE Microwave Theory and Techniques Society
Sponsor Committee
MTT/SC - Standards Committee
Working Group
MSMU_WG - Modulated Signal Measurement Uncertainty
Learn More About MSMU_WG - Modulated Signal Measurement Uncertainty
IEEE Program Manager
Vanessa Lalitte
Contact Vanessa Lalitte
Working Group Chair
Paritosh Manurkar

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


1765-2022

IEEE Recommended Practice for Estimating the Uncertainty in Error Vector Magnitude of Measured Digitally Modulated Signals for Wireless Communications

Recommended practices for the evaluation of receiver measurements of error vector magnitude of a digitally modulated wireless communication signal and the evaluation of the associated uncertainty are provided in this recommended practice. NOTE: Source codes are available at https://opensource.ieee.org/1765/1765/

Learn More About 1765-2022

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.