Provided in this document are specific requirements for field installed sealing between a pressurized system (stream) containing flammable or combustible process fluids which is connected directly or indirectly to an electrical system where a failure could allow the migration of process fluids directly into the electrical system. Not addressed in this document are the basic requirements for electrical safety and the effects of the loss of containment of the process system in terms of risk to the environment and/or personnel health and safety.
- Sponsor Committee
- IAS/PCI - Petroleum and Chemical Industry
- Status
- Active Standard
- PAR Approval
- 2009-12-09
- Board Approval
- 2015-12-05
- History
-
- ANSI Approved:
- 2017-05-05
- Published:
- 2016-02-29
Working Group Details
- Society
- IEEE Industry Applications Society
- Sponsor Committee
- IAS/PCI - Petroleum and Chemical Industry
- Working Group
-
1673_WG - High Pressure Conduit & Cable Seal Working Group
- IEEE Program Manager
- Michael Kipness
Contact Michael Kipness - Working Group Chair
- Martin Cole
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards