This guide suggests surge arrester installation methods at distribution cable terminal poles in order to minimize the total impressed transient voltage on medium-voltage distribution cables. Grounding electrode techniques, pole ground values, and system ground grid values are not addressed or considered in this document.
- Standard Committee
- PE/IC - Insulated Conductors
- Status
- Inactive-Reserved Standard
- Board Approval
- 1996-12-10
- History
-
- ANSI Approved:
- 1997-05-15
- Reaffirmed:
- 2003-09-11
- Inactivated Date:
- 2019-11-07
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/IC - Insulated Conductors
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards