The technical requirements to engineer, design, specify, fabricate, manufacture, furnish,install, test, commission, and provide as-built documents for air-insulated substations are covered.This guide investigates the methods, practices, and requirements of both users and suppliers in order to promogate a systematic and coordinated approach for development of specifications for turn-key substation projects.
- Sponsor Committee
- PE/SUB - Substations Committee
- Status
- Superseded Standard
- Superseded by
- 1267-2019
- Board Approval
- 1999-06-26
- History
-
- ANSI Approved:
- 2006-03-28
- ANSI Withdrawn Date:
- 2016-08-19
- Published:
- 1999-12-30
- Reaffirmed:
- 2005-12-07
Working Group Details
- Society
- IEEE Power and Energy Society
- Sponsor Committee
- PE/SUB - Substations Committee
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards