Superseded by 1246-2002. The design, performance, use, testing, and installation of temporary protective grounding systems, including the connection points, as used in permanent and mobile substations are covered.
- Standard Committee
- PE/SUB - Substations Committee
- Status
- Superseded Standard
- Superseded by
- 1246-2002
- Board Approval
- 1996-08-01
- History
-
- ANSI Approved:
- 1998-04-24
- Published:
- 1997-11-12
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/SUB - Substations Committee
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards