The interdisciplinary tasks that are required throughout a system's life cycle to transform customer needs, requirements, and constraints into a system solution are defined. This standard applies to a performing activity within an enterprise that is responsible for developing a product design and establishing the life cycle infrastructure needed to provide for life cycle sustainment. It specifies the requirements for the systems engineering process and its application throughout the product life cycle. The requirements of this standard are applicable to new products as well as incremental enhancements to existing products
- Standard Committee
- C/S2ESC - Software & Systems Engineering Standards Committee
- Status
- Superseded Standard
- Superseded by
- 1220-1998
- Board Approval
- 1994-12-13
- History
-
- Published:
- 1995-02-28
Working Group Details
- Society
- IEEE Computer Society
- Standard Committee
- C/S2ESC - Software & Systems Engineering Standards Committee
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards