Superseded Standard

IEEE 122-1985

IEEE Recommended Practice for Functional Performance Characteristics of Control Systems for Steam Turbine-Generator Units

Superseded by 122-1991. Minimum functional and performance characteristics related to speed/load-control systems for steam turbine-generator units that may be interconnected on a power system are recommended. The recommendations apply to the following types of steam turbines, rated at 500 kW and larger, intended to drive electric generators at constant speed without initial steam-pressure control, exhaust steam pressure control, or either: (1) condensing or noncondensing turbines without initial steam-pressure control, exhaust steam-pressure control, or either, including turbines used with reheat, regenerative feedwater heaters, or both; (2) condensing or noncondensing turbines with initial and/or exhaust steam-pressure control, including turbines used with reheat, regenerative feedwater heaters, or both; (3) automatic extraction and/or induction and mixed-pressure turbines. Emergency governors, other overspeed control devices, and, in general, devices that are not responsive to speed are not covered.

Standard Committee
PE/EDPG - Energy Development & Power Generation
Status
Superseded Standard
Superseded by
122-1991
Board Approval
1982-09-23
History
ANSI Approved:
1986-01-01
Published:
1985-07-22

Working Group Details

Society
IEEE Power and Energy Society
Standard Committee
PE/EDPG - Energy Development & Power Generation

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.