Withdrawn Standard. Withdrawn Date: Jan 10, 2002. No longer endorsed by the IEEE. A set of standard procedures for determining and verifying the total losses of a high-voltage direct-current (HVDC) converter station is recommended. The procedures are applicable to all parts of the converter station and cover standby, partial load, and full load losses and methods of calculation and measurement. All line commutated converter stations used for power exchange in utility systems are covered. Loss determination procedures for synchronous compensators or static var compensators are not included.
- Standard Committee
- PE/SUB - Substations Committee
- Status
- Inactive-Withdrawn Standard
- Board Approval
- 1991-09-26
- History
-
- Withdrawn:
- 2002-01-10
- ANSI Approved:
- 1992-05-06
- Published:
- 1992-02-26
- Reaffirmed:
- 1996-06-20
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/SUB - Substations Committee
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards