Reaffirmed March 2012. This guide is intended for the hydroelectric power industry to assist hydroelectric power plant owners, operators, and designers in the economic (feasibility) and technical evaluation (electrical aspects) of existing hydroelectric installations for rehabilitation. It addresses conventional hydropower. Portions of this guide are relevant to pumped storage but the unique features of pumped storage are not covered. Feasibility study results may indicate redevelopment of the site. Redevelopment will not be treated in detail in this guide. This guide covers all generating equipment up to and including the main transformer and typical auxiliary equipment.
- Standard Committee
- PE/EDPG - Energy Development & Power Generation
- Status
- Superseded Standard
- PAR Approval
- 2001-09-27
- Superseded by
- 1147-2021
- Superseding
- 1147-1991
- Board Approval
- 2005-09-22
- History
-
- ANSI Approved:
- 2006-01-26
- ANSI Withdrawn Date:
- 2016-08-19
- Published:
- 2006-03-22
- Reaffirmed:
- 2012-03-29
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/EDPG - Energy Development & Power Generation
- Working Group
-
HPS - WG 1147 - HPS - Rehabilitation of Hydroelectric Power Plants Working Group
- IEEE Program Manager
- Vanessa Lalitte
Contact Vanessa Lalitte - Working Group Chair
- Randall Groves
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
1147-2021
IEEE Guide for the Rehabilitation of Hydroelectric Power Plants
This guide is intended for the hydroelectric power industry to assist hydroelectric power plant owners, operators, and designers in the economic (feasibility) and technical evaluation (electrical aspects) of existing hydroelectric installations for rehabilitation. It addresses conventional hydropower. Portions of this guide are relevant to pumped storage, but the unique features of pumped storage are not covered. Feasibility study results may indicate redevelopment of the site. Redevelopment will not be treated in detail in this guide. This guide covers all generating equipment up to and including the main transformer and typical auxiliary equipment.
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards