Significant community acceptance and environmental compatibility items to be considered during the planning and design phases, the construction period, and the operation of electric supply substations are identified, and ways to address these concerns to obtain community acceptance and environmental compatibility are documented. On-site generation and telecommunication facilities are not considered.
- Standard Committee
- PE/SUB - Substations Committee
- Status
- Superseded Standard
- PAR Approval
- 2009-12-09
- Superseded by
- 1127-2023
- Superseding
- 1127-1998
- Board Approval
- 2013-12-11
- History
-
- Published:
- 2014-01-24
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/SUB - Substations Committee
- Working Group
-
WGG2 - Inactive - IEEE Guide for the Design, Construction, and Operation of Electric Power Substations for Community Acceptance and Environmental Compatibility
- IEEE Program Manager
- Patricia Roder
Contact Patricia Roder - Working Group Chair
- Thomas Proios
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards