A test procedure that applies to single- and three-phase units rated from 1 kW to 500 kW and may also be applied in principle to larger units is given. The objective is the measurement of electrical parameters at the ac terminals of the power converter. The procedure may serve as a basis for factory or acceptance testing. It focuses on equipment that lends itself to mass production and is readily interconnected to an electric utility, rather than on equipment subject to site-specific design and testing. Test results may be used in evaluating or comparing different types of static power converters. Only equipment with the primary function of delivering electric energy to circuits interconnected with the electric utility is covered by this procedure.
- Status
- Inactive-Withdrawn Standard
- Board Approval
- 1989-06-01
- History
-
- Withdrawn:
- 1995-05-05
- ANSI Approved:
- 1989-10-27
- Published:
- 1989-11-22
Working Group Details
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards