Description of the electrical control and monitoring requirements for equipment and systems associated with small (100 kVA to 5 MVA) hydroelectric power plants.
- Standard Committee
- PE/EDPG - Energy Development & Power Generation
- Status
- Inactive-Reserved Standard
- PAR Approval
- 2011-05-17
- Superseded by
- 1020-2023
- Superseding
- 1020-1988
- Board Approval
- 2011-12-07
- History
-
- Published:
- 2012-04-12
- Inactivated Date:
- 2022-03-24
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/EDPG - Energy Development & Power Generation
- Working Group
-
HPS - WG 1020 - HPS - Control of Small (100 kVA to 5 MVA)Hydroelectric Power Plants Working Group
- IEEE Program Manager
- Vanessa Lalitte
Contact Vanessa Lalitte - Working Group Chair
- Derek Brown
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
1020-2023
IEEE Guide for Control of Small (100 kVA to 5 MVA) Hydroelectric Power Plants
Description of the electrical control, protection, and monitoring requirements for equipment and systems associated with small (100 kVA to 5 MVA) hydroelectric power plants are described in this standard.
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards