" The minimum tests and inspections required to evaluate photovoltaic concentrating mod-ules, and a common approach (e.g., between producer and purchaser) in conducting qualification tests are provided. "
- Standard Committee
- BOG/SC21 - Distributed Generation, Energy Storage and Interoperability Standards Committee
- Status
- Inactive-Withdrawn Standard
- PAR Approval
- 1997-12-09
- Board Approval
- 2001-03-17
- History
-
- Withdrawn:
- 2007-01-18
- ANSI Approved:
- 2001-08-02
- ANSI Withdrawn Date:
- 2011-09-09
- Published:
- 2001-05-10
Working Group Details
- Society
- Standard Committee
- BOG/SC21 - Distributed Generation, Energy Storage and Interoperability Standards Committee
- Working Group
-
ADMIN_8223 - Project Administration_8223
- IEEE Program Manager
- Malia Zaman
Contact Malia Zaman
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
1547-2003
IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems
This standard is the first in the 1547 series of interconnection standards and is a benchmark milestone demonstrating the open consensus process for standards development. Traditionally, utility electric power systems (EPS--grid or utility grid) were not designed to accommodate active generation and storage at the distribution level. As a result, there are major issues and obstacles to an orderly transition to using and integrating distributed power resources with the grid. The lack of uniform national interconnection standards and tests for interconnection operation and certification, as well as the lack of uniform national building, electrical, and safety codes, are understood. IEEE Std 1547 and its development demonstrate a model for ongoing success in establishing additional interconnection agreements, rules, and standards, on a national, regional, and state level. IEEE Std 1547 has the potential to be used in federal legislation and rule making and state public utilities commission (PUC) deliberations, and by over 3000 utilities in formulating technical requirements for interconnection agreements for distributed generators powering the electric grid. This standard focuses on the technical specifications for, and testing of, the interconnection itself. It provides requirements relevant to the performance, operation, testing, safety considerations, and maintenance of the interconnection. It includes general requirements, response to abnormal conditions, power quality, islanding, and test specifications and requirements for design, production, installation evaluation, commissioning, and periodic tests. The stated requirements are universally needed for interconnection of distributed resources (DR), including synchronous machines, induction machines, or power inverters/converters and will be sufficient for most installations.
1547.1-2005
IEEE Standard Conformance Test Procedures for Equipment Interconnecting Distributed Resources with Electric Power Systems
This standard specifies the type, production, and commissioning tests that shall be performed to demonstrate that the interconnection functions and equipment of the distributed resources (DR) conform to IEEE Std 1547(TM). https://standards.ieee.org/content/dam/ieee-standards/standards/web/documents/interpretations/1547.1-2005_interp.pdf
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards