Inactive-Reserved Standard

IEEE/IEC 1249-2013

IEC/IEEE Guide for Computer-based Control for Hydroelectric Power Plant Automation

This guide addresses the application, design concepts, and implementation of computer-based control systems for hydroelectric plant automation. It addresses functional capabilities, performance requirements, interface requirements, hardware considerations, and operator training. It includes recommendations for system testing and acceptance. The electrical protective system (generator and step-up transformer) is beyond the scope of this guide.

Standard Committee
PE/EDPG - Energy Development & Power Generation
Status
Inactive-Reserved Standard
PAR Approval
2013-06-14
Superseding
1249-1996
Board Approval
2013-06-14
History
Published:
2013-09-27
Inactivated Date:
2024-03-21

Working Group Details

Society
IEEE Power and Energy Society
Standard Committee
PE/EDPG - Energy Development & Power Generation
Working Group
HPS - WG 1249 - HPS - Computer Based Controls for Hydroelectric Power Plant Automation Working Group
IEEE Program Manager
Vanessa Lalitte
Contact Vanessa Lalitte
Working Group Chair
James Volk

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


P1249
Guide for Digital Control for Hydroelectric Power Plant Automation

This guide addresses the application, design concepts, and implementation of digital control systems for hydroelectric plant automation. It addresses functional capabilities, performance requirements, interface requirements, hardware considerations, and operator training. It includes recommendations for system testing and acceptance. The electrical protective system (generator and step-up transformer) is beyond the scope of this guide.

Learn More About P1249

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


62270-2013
IEC/IEEE Guide for Computer-based Control for Hydroelectric Power Plant Automation

This guide addresses the application, design concepts, and implementation of computer-based control systems for hydroelectric plant automation. It addresses functional capabilities, performance requirements, interface requirements, hardware considerations, and operator training. It includes recommendations for system testing and acceptance. The electrical protective system (generator and step-up transformer) is beyond the scope of this guide.

Learn More About 62270-2013

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.