P82 - Standard Test Procedure for Impulse Voltage Tests on Insulated Conductors
Project Details
This test procedure applies to both switching impulse and lightning impulse tests on cables or cable systems incorporating laminated or extruded insulations. The term laminated cable, as used in this procedure, includes: high-pressure pipe cable, low-pressure gas-filled cable, self-contained liquid-filled cable, solid-paper cable, and other taped cable designs. A cable system is a cable with one or more accessories attached. This test procedure is intent is to indicate specific procedures for a specific type of cable system or cable system component. This test procedure does not apply to cables or cable systems that utilize gas or gas spacers as the sole insulating medium. This test procedure applies to individual cable accessories only when referenced by the specific accessory standard.
Standards Committee
PAR Approval
PARs
Additional Resources Details
Historical Base Standard
Working Group Details
Working Group
Standards Committee
Society
IEEE Program Manager
Existing Standards