P525 - Guide for the Design and Installation of Cable Systems in Substations
Project Details
This document is a guide for the design, installation, and protection of insulated wire and cable systems in substations with the objective of minimizing cable failures and their consequences. Cable systems with voltages greater than 35kV are not covered in this guide.
Standards Committee
PAR Approval
PARs
Additional Resources Details
Historical Base Standard
Working Group Details
Working Group
Standards Committee
Society
IEEE Program Manager
Existing Standards