Superseded Standard

IEEE 525-1992

IEEE Guide for the Design and Installation of Cable Systems in Substations

Guidance for the design, installation, and protection of wire and cable systems in substations with the objective of minimizing cable failures and their consequences is provided. The design of wire and cable systems in gen

Standard Committee
PE/SUB - Substations Committee
Status
Superseded Standard
Superseded by
525-2007
Superseding
525-1987
Board Approval
1992-09-17
History
ANSI Approved:
1993-02-23
Published:
1993-04-14
Reaffirmed:
1999-03-18

Working Group Details

Society
IEEE Power and Energy Society
Standard Committee
PE/SUB - Substations Committee
Working Group
WGD2 - WGD2 - Cable Systems in Substations
IEEE Program Manager
Patricia Roder
Contact Patricia Roder
Working Group Chair
Prudhvi Anand Bhattiprolu

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


P525
IEEE Draft Guide for the Design and Installation of Cable Systems in Substations

The design, installation, and protection of wire and cable systems in substations are covered in this guide, with the objective of minimizing cable failures and their consequences.

Learn More About P525

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


525-2016
IEEE Guide for the Design and Installation of Cable Systems in Substations

The design, installation, and protection of wire and cable systems in substations are covered in this guide, with the objective of minimizing cable failures and their consequences

Learn More About 525-2016

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


525-2007
IEEE Guide for the Design and Installation of Cable Systems in Substations

The design, installation, and protection of wire and cable systems in substations with the objective of minimizing cable failures and their consequences are covered in this guide.

Learn More About 525-2007

525-2007/Cor 1-2008
IEEE Guide for the Design and Installation of Cable Systems in Substations - Corrigendum 1

Correcting the axis labels of a figure J1 located in annex J.

Learn More About 525-2007/Cor 1-2008

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.