Withdrawn standard. Guidelines and operating procedures necessary to connect and operate a small wind energy conversion system (SWECS) user, owner, or installer with interface in parallel with an electric utility system are provided for the user, owner, or installer of the SWECS. The interface between the wind system and the utility and the factors relating to equipment protection, power quality, and the safety of operating personnel and the general public are addressed. Installation approval procedures are covered.
- Standard Committee
- SASB -
- Status
- Inactive-Withdrawn Standard
- Board Approval
- 1986-12-11
- History
-
- Withdrawn:
- 1996-05-20
- ANSI Approved:
- 1987-05-18
- Published:
- 1987-11-30
Working Group Details
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards