Specific configuration requirements within the relevant Internet Engineering Task Force (IETF) Request for Comments (RFC) for implementation of the Internet Protocol Security (IPsec) protocol suite within a utility control system are identified in this standard. It is not intended to be a comprehensive guide to implementing IPsec. Promoting interoperability between products developed by different vendors is the primary goal in developing this standard. Configuration parameters needed to support the establishment and sustained operation of an IPsec Virtual Private Network (VPN) tunnel between two devices which have implemented IPsec conforming to this standard are the focus of this standard. Minimizing configuration errors involving IPsec implementations within utility control systems is a secondary goal of this standard. Product agnosticism and applicability to any device (e.g., router, substation gateway, intelligent electronic device, etc.) is the intent of this standard, within the utility control system as the end user deems necessary for their unique system architecture.
- Standard Committee
- PE/PSCC - Power System Communications and Cybersecurity
- Status
- Active Standard
- PAR Approval
- 2015-02-16
- Board Approval
- 2020-12-03
- History
-
- Published:
- 2021-03-12
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/PSCC - Power System Communications and Cybersecurity
- Working Group
-
S0/P2030.102.1 - Interoperability of Secure IP Protocols Utilized within Utility Control Systems
- IEEE Program Manager
- Tom Thompson
Contact Tom Thompson - Working Group Chair
- James Bougie
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards